Seismic & Gravity Load Validation
We verify lateral and vertical load paths against NBC Part 4, reducing redesign risk during permit review.
Years of NBC code application
Feasibility studies delivered
Permit-ready compliance reports
Provinces with active projects
We verify lateral and vertical load paths against NBC Part 4, reducing redesign risk during permit review.
Our team maps your proposed use to NBC occupancy categories, ensuring fire separation and egress meet local bylaws.
We cross-check soil reports with NBC foundation requirements, flagging settlement or bearing-capacity issues early.
We audit floor plans against NBC Part 3 accessibility standards, covering door widths, ramps, and washroom clearances.
We review fire-resistance ratings, sprinkler zones, and exit travel distances to avoid costly late-stage changes.
Visual Reference Library
Finite element model showing shear wall layout and outrigger truss locations for a 28-storey mixed-use building. The analysis confirmed NBC seismic drift limits under a 2% in 50-year event.
Overlay of zoning bylaw districts and NBC occupancy classifications for a 12-hectare site. The map highlights setback constraints and fire separation requirements that shaped the final layout.
Section drawing of concealed steel bracing and a new fire-rated floor assembly within a 1920s masonry structure. The solution preserved the original facade while meeting NBC gravity and fire-resistance ratings.
Illustration of column and wall load distribution from roof to foundation. The diagram was used to validate NBC specified live load reductions and to size transfer girders at the podium level.
Cross-section of a 2-hour fire-rated wall assembly between warehouse and office areas. The detail meets NBC Article 3.1.7. requirements for fire compartments in industrial occupancies.
Plan view of accessible routes from street entrance to elevator lobby and commercial units. The layout was verified against NBC Section 3.8 for clear widths, turning spaces, and ramp gradients.
Explore further structural feasibility studies and land-use compliance resources aligned with the National Building Code of Canada.
Comprehensive structural analysis and NBC compliance for a 28-storey residential-commercial highrise in a seismic zone. The study confirmed the viability of a reinforced concrete core with steel outriggers.
View projectZoning and NBC alignment for a 12-hectare industrial development. The work involved fire separation requirements, accessibility standards, and occupancy classification analysis.
View projectStructural upgrade and code compliance for a 1920s heritage structure. The discreet steel bracing and fire-rated floor assembly preserved the original facade while meeting modern NBC requirements.
View projectA concrete post detailing the considerations behind a recent structural feasibility review, including load path analysis and code constraint discussions.
Read postPractical decisions and tradeoffs encountered during the initial compliance assessment for a commercial land-use project in Ontario.
Read post